PC POM Plastic PP Injection Molding Hook Mould With LKM DME Base
Place of Origin DONGGUAN CHINA
Brand Name WEIYU
Certification ISO9001:2008
Model Number WY-IPH05
Minimum Order Quantity 1SET
Price NEGOTIATION
Packaging Details WOODEN BOX WITH STEEL FRAME
Delivery Time 30 DAYS
Payment Terms T/T
Supply Ability 30SETS
Product Details
High Light

plastic injection mold making

,

injection molding cavity

Product Description

 

PC / PP / POM Plastic Injection Mold , Plastic Hook Mould With LKM / DME / HASCO Base

 

 

Quick Detail:

 

1 . material:PE, PVC ABS, PC, PP, POM, PA6( PA66, GF filled), PMMA, PET(PBT).

2 . Precise Electronic Plastic Component Mould
3 . Cavity:Single/Multi
4 . Base:LKM, HASCO ect
5 . Runner :Hot/cold

 

 

Description:

 

Parts Material:Plastic injection molding grade, such as PE, PVC ABS, PC, PP, POM, PA6( PA66, GF filled), PMMA, PET(PBT).

Cav.& Cor. Material:P20, H13,S136, NAK80, 718, 2738, 2316, SKD61 etc;

Mold Base:LKM, DME, HASCO or Customize according to customers' requirements;

Cavity quantity: 1*1, 1+1, 1*2, 1+1+1, etc.    

Shot Runner:Cold or Hot Runner_ HASCO/DME/YUDO etc. 

Mold lifetime:100K to 1500k shots or according to customers quantity condition to decide it with saving cost for our customers. 

Soft wares: CAD/CAM/CAE, UG, Pro/E,  Powmill, Solid works etc.

 

 

Applications:

 

This product will be widely used on the construction industry, it is a Personal Protection Equipment, usually used for high sky building working.

 

 

Specifications:

 

1. Communication→Customer Technical Representative→Content Requirement→Design People. Communication→Mold User→Use and Maintence→Design People. Communication→Customer Project

2. Designing→Design based on new mold confirmation, and confirm with the customer

3. purchasing and processing→purchase accirding to material sheet, process and assemble according to 2D/3D drawings, dimensional test of all parts to ensure a correct match with the drawing

4. Authentication→trial production according to designed machine model and mold flow analysis,organize 3rd-party review, provide with the customers satisfied products/molds at earliest time.

5. based on the above 4 steps, set up a project team and assign a project manager and a project director to follow up the case.

1. project manager: to follow up the project and to communicate with customer

2. project director: ensure development of the mold and the quality from technical point of view.

 

Leave a Message